Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig

Product Details
Customization: Available
After-sales Service: Video Can Provide Technical Guidance and Assistanc
Warranty: 6 Mothes
Still deciding? Get samples of US$ 16500/Set
Request Sample
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
to see all verified strength labels (15)
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
  • Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Find Similar Products

Basic Info.

Model NO.
GYL-200
Certification
ISO 9001:2000, ISO 9001:2008
Condition
New
Motor
DC Motor
Drill Hole Diameter
300mm 76mm 46mm
Drill Hole Depth
60m 225m 295m
Bit Type
Diamond Bit
Drilling Way
Rotary
Weight
3600kgs
Transport Package
Wooden Crate Packaging
Specification
3650mm*2100mm*2250mm
Trademark
Chang Tan
Origin
China
HS Code
8207191000
Production Capacity
2000pieces/Year

Product Description

The GYL-200 Engineering Drilling Rig is a remarkably lightweight yet highly versatile solution crafted for engineering surveys and construction projects! Designed to tackle various terrains with ease, this rig features added tracks and a robust drilling tower, evolved from the GY-200-2A model. It can be seamlessly equipped with BWQ mud pumps, making it an ideal choice for engineering geological explorations across industrial, civil construction, railways, bridges, hydropower sectors, and the construction of small-diameter foundation pile holes.
Unleash a suite of remarkable characteristics:
1. Unparalleled speed versatility with a sensible range of grades. Low-speed, high-torque capabilities make it perfect for sampling and constructing pile holes with precision and reliability.
2. Fitted with innovative forward and backward moving oil cylinders, the entire rig can effortlessly glide a distance of 400 millimeters, significantly easing the lifting and lowering processes of drilling tools.
3. Experience the perfect blend of ease and efficiency with oil pressure feeding. Operate with effortless precision, achieve high drilling efficiency, and enjoy reduced labor intensity. The drilling tower is not only robust and stable but also easy to install and relocate, featuring minimal components for quick setup and flexible inclination adjustments.
Discover impressive features:
1. Boasting large torque and a spectrum of drilling speeds within an optimal range, this rig is engineered for peak performance.
2. The rig is equipped with two reverse rotation speeds, facilitating seamless drilling operations and easy handling of any drilling challenges that arise.
3. Capable of sliding on its 400mm frame, it provides ample space for efficiently handling drilling tools over the hole, ensuring smooth and uninterrupted operations.
4. Achieve high-efficiency drilling with the advanced hydraulic feeding structure, designed to enhance productivity and minimize effort.
5. A stable, high-strength drilling mast with a limited number of components, it is engineered for easy assembly, ensuring you can set up swiftly and securely.
6. Versatile in application, this rig is perfect for geotechnical investigations, wireline core drilling for mineral exploration, hole boring for water wells, and constructing small-size piling holes.
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Technical Figures:
Basic Parameters
Drilling depth 60m 225m 295m
Drilling diameter 300mm 76mm 46mm
Drill pipe diameter 50mm   42mm
Spindle turnable angle 0°~ 360°
Weight 3600kgs
Size (length*width*height) 3.65m*2.1m*2.25m
RotaryTable
Speed Forward 900  475 388 205 157 68r/min
Reverse 256  85r/min
Maximum torque 2000N*m
Feeding travel 400mm
Maximum cylinderfeeding force 29KN
Maximum cylinder lifting force 39KN
Lifter
Lifting capacity 30kN
Bobbinlinespeed,2ndlayer 0.27  0.64  0.83  1.58  1.64 m/s
Bobbin diameter 135mm
Rope diameter 12.5mm
Rope capacity 30m
Oil Pump
Type CBF-F420-ALPL Gear Oil Pump
Displacement 20mL/r
Ratedspeed 2500r/min
Rated pressure 20MPa
Maximum pressure 25MPa
Power
      Type                                                                        Y160L-4  ChangChai ZS1110 
Rated power 15KW 14.7KW
Rated speed 1460r/min 2200r/min
 Weight 144kgs 180kgs
Frame
Model Slidingtype(with base frame)
Movable travel of drill 400mm
Distance between drill and hole-opening 270mm
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
 
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig
Heavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig

Heavy-Duty Gyl-200 Crawler Type Water Well Drilling RigHeavy-Duty Gyl-200 Crawler Type Water Well Drilling RigHeavy-Duty Gyl-200 Crawler Type Water Well Drilling RigHeavy-Duty Gyl-200 Crawler Type Water Well Drilling RigHeavy-Duty Gyl-200 Crawler Type Water Well Drilling Rig

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier